# Water Efficiency Calculations

> Source: https://h2ogeo.co.uk/water-efficiency-calculations/  
> Last updated: 2026-09-01

## Fixed-Fee, Fast-Track Discharge of Water Efficiency Conditions (110 L/p/d)

### How H2Ogeo Ltd helps you unlock occupation without delays

Planning conditions tied to **water efficiency (110 litres/person/day under Part G2)** are now standard across many Local Planning Authorities. On paper, they look straightforward. In reality, they can **hold up first occupation**, delay completions, and create unnecessary back-and-forth with the Council if not handled properly.

At **H2Ogeo Ltd**, we take a different approach:
👉 **Fixed-fee, lump-sum discharge packages**
👉 **Clear, policy-aligned submissions**
👉 **Fast turnaround, no surprises**

## 🚧 The Problem Developers & Agents Face

You’ve secured planning. Build is underway (or complete). Then comes the condition:

> *“No dwelling shall be occupied until a scheme demonstrating 110 litres per person per day… has been submitted to and approved…”*

Typical issues we see:

- ❌ Unclear what the LPA actually expects
- ❌ Overly complex or underdeveloped submissions
- ❌ Rejections due to missing assumptions (e.g. occupancy rates)
- ❌ Delays impacting sales, handovers, or refinancing

Even though it’s a **“simple” condition**, it often becomes a **critical path blocker**.

## 💡 The H2Ogeo Solution

We provide a **complete, ready-to-approve discharge package** on a **fixed fee basis** — designed specifically for UK planning authorities and aligned with:

- Building Regulations **Part G (G2 optional standard)**
- Local Plan policies (e.g. sustainability / water efficiency policies)
- LPA validation expectations

## 📦 What You Get (All-Inclusive)

Our standard fixed-fee package includes:

### 1. **Water Efficiency Calculation**

- Robust, policy-compliant calculation
- Based on **2.4 persons per dwelling** (or project-specific occupancy)
- Demonstrates compliance with **≤110 L/person/day**

### 2. **Technical Statement**

A concise, professional report suitable for direct submission, including:

- Site and development description
- Methodology and assumptions
- Fixture specifications
- Clear compliance statement

### 3. **Specification Review**

We check your proposed fittings against targets:

- WC flush volumes
- Shower and tap flow rates
- Appliances (where relevant)

👉 If anything doesn’t comply, we’ll let you know

### 4. **Submission-Ready Format**

- Clean, LPA-friendly document
- Minimal risk of validation issues
- Designed to be **approved first time**

## ⚡ Why Fixed Fee Matters

Most consultants treat this as an open-ended task. We don’t.

With H2Ogeo Ltd:

- 💷 **Fixed price agreed upfront**
- ⏱ **No scope creep or hourly billing**
- 📉 **Cost certainty for your project budget**

This is especially valuable for:

- Multi-unit developments
- Tight programme deadlines
- [Planning condition](https://h2ogeo.co.uk/services/discharge-of-planning-conditions/) discharge bundles

## 🚀 Turnaround That Keeps Projects Moving

We understand this is often on the **critical path to occupation**.

Typical delivery:

- **2–5 working days** from instruction
- Faster turnaround available where needed

👉 Our goal: **keep your programme moving, not slow it down**

## 🧠 Designed for Approval (Not Just Submission)

We don’t just “do the calc” — we design submissions that LPAs are comfortable approving.

No ambiguity. No gaps. No unnecessary queries.

## 🏗️ Who We Work With

We regularly support:

- Planning consultants
- Developers and housebuilders
- Architects
- Land promoters

Whether it’s:

- A **single dwelling**, or
- A **multi-plot scheme**

—we provide the same streamlined, fixed-fee service.

## 🏁 Straightforward, Professional, Done

Water efficiency conditions shouldn’t delay your project.

With H2Ogeo Ltd, you get:

- ✔ Fixed-fee certainty
- ✔ Fast, reliable turnaround
- ✔ Policy-compliant reporting
- ✔ High likelihood of first-time approval

## 📩 Ready to Discharge Your Condition?

If you have a **110 L/p/d water efficiency condition** to discharge:

👉 Send us your:

- Site address
- Number of dwellings
- Proposed specification (if available)

We’ll provide a **fixed fee and rapid turnaround** so you can move forward with confidence.

**H2Ogeo Ltd**
*Practical hydrogeology. Planning-led solutions. Delivered efficiently.*

![Water Efficiency Calculations](https://h2ogeo.co.uk/wp-content/uploads/2026/08/6cdb9452dd864b8dbc66a702b157c574.jpeg)

## Related

- **Service:** [Discharge of Environmental Planning Conditions](https://h2ogeo.co.uk/services/discharge-of-planning-conditions/)
- [Building Regulations Part G2 standard of no more than 110 litres per person per day](https://h2ogeo.co.uk/building-regulations-part-g2-standard-of-no-more-than-110-litres-per-person-per-day/)
- [Cemetery Extensions: Why Hydrogeology Matters and How H2Ogeo Ltd Can Help](https://h2ogeo.co.uk/cemetery-extensions-why-hydrogeology-matters-and-how-h2ogeo-ltd-can-help/)
- [Discharging Environmental Planning Conditions – How H2Ogeo Helps Planning Agents and Architects](https://h2ogeo.co.uk/discharging-environmental-planning-conditions-how-h2ogeo-helps-planning-agents-and-architects/)

## Common questions

### What problem do water efficiency conditions cause developers?
Even though it's a “simple” condition, water efficiency conditions often become a critical path blocker: issues include being unclear what the LPA actually expects, overly complex or underdeveloped submissions, rejections due to missing assumptions such as occupancy rates, and delays impacting sales, handovers or refinancing.

### What is included in H2Ogeo's water efficiency discharge package?
A Water Efficiency Calculation based on 2.4 persons per dwelling (or project-specific occupancy) demonstrating compliance with ≤110 L/person/day, a Technical Statement covering site description, methodology and compliance, a Specification Review checking proposed fittings against targets, and a submission-ready, LPA-friendly document.

### How long does it take to discharge a water efficiency condition?
Typical delivery is 2–5 working days from instruction, with faster turnaround available where needed.

---

## Contact H2Ogeo Ltd
Independent Hydrogeology & Environmental Consultancy

- Phone: +447787231455
- Email: info@h2ogeo.co.uk
- Web: https://h2ogeo.co.uk
