# Winter Groundwater Monitoring For Planning.

> Source: https://h2ogeo.co.uk/winter-groundwater-monitoring-for-planning/  
> Last updated: 2026-09-01

Groundwater elevations in Sussex tend to peak around February to March.

Due to the devastating impact of groundwater flooding events Local Planning Authorities (LPAs) sometimes request monitoring of Winter groundwater levels as part of a planning permission.

In parts of Sussex, when considering [SuDS](https://h2ogeo.co.uk/services/flood-risk-and-drainage-support/) for your development, the design must include adequate [Winter groundwater monitoring](https://h2ogeo.co.uk/services/groundwater-monitoring-and-assessment/) to determine the highest winter groundwater table. Arun District Council require residential developments of five properties or more to have groundwater monitoring carried out between October and March inclusive.

This period typically reflects the lowest levels and peak elevations.

Smaller developments can be subject to agreement with the LPA’s Engineers but will need to capture the likely peak groundwater levels during the winter period.

Adequate unsaturated zone must be present beneath the base of a planned soakaway structure and the highest recorded groundwater level identified in that location. This unsaturated zone ensures adequate soakage medium and provides attenuation and protection to the underlying Controlled Waters.

H2Ogeo provides a technical approach to groundwater monitoring and our bespoke designs, execution and reporting means Clients’ needs are met whilst obtaining approval from LPAs.

For more information on groundwater monitoring and how we can help you meet the requirements Contact us today

groundwater monitoringhydrogeologyplanning conditionsdischarge of conditionswinter groundwater levels

![Winter Groundwater Monitoring For Planning.](https://h2ogeo.co.uk/wp-content/uploads/2026/08/6cdb9452dd864b8dbc66a702b157c574.jpeg)

## Related

- **Service:** [Groundwater Monitoring & Assessment](https://h2ogeo.co.uk/services/groundwater-monitoring-and-assessment/)
- [Discharging Environmental Planning Conditions – How H2Ogeo Helps Planning Agents and Architects](https://h2ogeo.co.uk/discharging-environmental-planning-conditions-how-h2ogeo-helps-planning-agents-and-architects/)
- [Do I Need a BRE365 Soakaway Test Before Submitting Planning?](https://h2ogeo.co.uk/do-i-need-a-bre365-soakaway-test-before-submitting-planning/)
- [Environment & Planning in Sussex 2026, What’s changing and how can H2Ogeo help?](https://h2ogeo.co.uk/environment-amp-planning-in-sussex-2026-whats-changing-and-how-can-h2ogeo-help/)

## Common questions

### When do groundwater elevations typically peak in Sussex?
Groundwater elevations in Sussex tend to peak around February to March.

### What period must winter groundwater monitoring cover for a SuDS development?
In parts of Sussex, the drainage design must include adequate winter groundwater monitoring to determine the highest winter groundwater table. Arun District Council requires residential developments of five properties or more to have groundwater monitoring carried out between October and March inclusive, which typically reflects the lowest levels and peak elevations.

### What must be present beneath a soakaway structure?
An adequate unsaturated zone must be present beneath the base of a planned soakaway structure and the highest recorded groundwater level identified in that location. This unsaturated zone ensures adequate soakage medium and provides attenuation and protection to the underlying Controlled Waters.

---

## Contact H2Ogeo Ltd
Independent Hydrogeology & Environmental Consultancy

- Phone: +447787231455
- Email: info@h2ogeo.co.uk
- Web: https://h2ogeo.co.uk
